ro,reuse,آب شیرین کن ،تصفیه فاضلاب

Project Description

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes. Etiam facilisis venenatis libero.

  • subject: Water Treatment & WW Reuse
    A plant (for Industrial Water Production)
  • Capacity: 33,600 m3/day (UF Unit),
    24,000 m3/day (Pass 1),
    3,960 m3/day (Pass 2)
  • Source: Zarand Sanitary WWTP Effluent
  • Location: Kerman – Zarand

Nam sed lectus nec lacus accumsan sagittis quis in nunc. Pellentesque iaculis augue quis magna ultricies euismod. Integer tincidunt consequat lectus, quis tempus enim vulputate sem pulvinar maximus.

Sabzevar Steel Co.
Chadormalu Mining & Industrial
Menu