پروژه فولاد کاوه جنوب کیش

فولاد کاوه جنوب کیش


Consulting: SOMIC Engineering Co.

Contract: EPC

Location: Bandar abbas

Capacities: 3120 m3/d 

Source & Flow:
Following is the maximum industrial waste water which produced in cooling circuits or process through three different Phases:
Treatment Plant, 1st Phase: Direct Reduction plant modules A/B 110 m3/hr
Treatment Plant, 2nd Phase: Steel Making Plant Phase I 130 m3/hr
Treatment Plant, 3rd Phase: Steel Making Plant Phase II 130 m3/hr

Application: Industrial Water for SMP, Phase 1

Treatment Method: coagulation, flocculation, DAF and Selfcleaning

kaveh
تصفیه فاضلاب